![]() |
![]() |
| Home l | Profile l | Values & Policies l | Projects l | Media Center l | Careers l | Contact Us l | Intranet |
![]() ![]() ![]() |
DUBAI INT'L AIRPORT CONCOURSE 2 AX059 INTERNAL PACKAGE |
||
Contract No. AX059 - Concourse 2, Terminal 3 & Car Major Scope of Work:
DUBAI AIRPORT TERMINAL 3 Features include a multi-level underground structure measuring 300m x 350m, first class lounges and dedicated counters, restaurants, 180 check-in counters and 2,600 underground parking spaces. The departures and arrivals halls within the terminal will be located 10m below the apron and taxiways. Passenger orientation will be heightened by maintaining visual contact with the landside through a fully glazed facade at one end and concourse 2, with its bright naturally lit atrium at the other. The Terminal incorporates two levels of vehicle parking that is planned within a landscaped area, enabling uninterrupted views of Terminal 3 and concourse 2 from the airport road. A commercial centre will be built around a roof-lit central atrium in the parking area. CONCOURSE 2 Additionally, there will be a direct connection to Sheikh Rashid Terminal located at the control tower structure. There is also a 300-room hotel and health club that will include both five and three star rooms. A further 10,000m² of commercial space will be home to the Dubai Duty Free retail outlet and various restaurants. Concourse 2 will include five aerobridges capable of handling the new Airbus A380 Super Jumbo. The two concourse buildings will be linked via these air bridges enabling transiting passengers to move freely between the two buildings. |
| Projects Gallery l Back to Home |
© 2008 Al Abbar Group, ICT Department. All rights reserved. |